My Home Theater Construction

Finish Drywall and Painting


Primer Coat

It took a couple of weeks but I finally got all the drywall mudded and sanded. And now a coat of primer.

Equipment Rack Framing

I also managed to get the equipment rack framed in. There will be trim that goes around the outside and I still need to order the glass door.

Cabinet Framing

The cabinet is completely framed. I have ordered and gotten in the 3/8” glass shelves for the cabinet. These will go in the two outside bays. In the center I will hang a poster.

For the stock cabinets on the bottom, I ended up reinforcing them with center pieces, just in case any Triangles decide to have a seat there. Never hurts to take a couple of extra steps and make things “Triangle Resistant”.